Investment raising

No prototype risk. The challenge is engineering scale.

The technology uses materials from the existing solar industry, integrated with proven processes — so the investment is not for feasibility, but for the design and construction of a production line in the MW–TW range.

MW → TW

Production line scale

0

Feasibility risk

proven materials, proven processes

97%

Cost advantage

vs. existing panel total cost

What the investment funds

  • Design of the continuous RTR production line
  • Construction & commissioning at MW–TW scale
  • Integration of common solar source materials
  • Engineering scale-up — not R&D

Why now

Global PV installation hit ~$500B annually. Operations & maintenance is on track for $20–30B. Glass markets, BIPV, floating PV, agri-PV and mobility are each compounding double-digits. The window to capture them with a single underlying technology is open.

Talk to the team